Facility: VW factory Sarajevo, hall 7

Ventilation of the entire production area of the production hall.

Built-in system with two air conditioning chambers and 10 roof fans (capacity 50,000 m³/h).

Year of implementation 2021-2022

Specificity of the project: High level of air pollution and difficult working conditions. A large number of welding places that were in operation during our work.